Steinbeisstraße 4 | 75334 Straubenhardt
Straubenhardt, plant 1 In 1989, the first construction phase of the current Plant 1 was built with an area of 2.500 m², which was expanded to a total of 4.000 m² in 1995 with the second construction phase. In addition to the administration, the plant includes the production areas of mechanics and prototyping.
Total area in square meters
Employees
Opening of the plant
Expansion of the plant